How belt conveyor installation and use of methods

    With the rapid development of science and technology, the conveyor has spread to every corner of human life and the fields, the use is more extensive. For mankind save a lot of time, labor, people's daily lives are increasingly inseparable from the conveyor. Transportation machinery operate side by

Type is divided into: 1: Belt Conveyor 2: screw conveyor 3: bucket elevator 4: Roller conveyor 5: measuring conveyor 6: plate chain conveyor 7: mesh belt conveyors, belt conveyors talk about today focus machine is installed.

    Install the belt conveyor engineering, installation of a belt conveyor rack rack installation is started from scratch, and then install the sections sequentially intermediate frame, the final installation of the tailstock. Before installing the rack, the first full length of the Incline Belt conveyor centerline Pull maintain conveyor centerline

A conveyor belt in a straight line an important condition for the normal operation, so the installation sections of the rack must be aligned with the center line, but also airs leveling rack to the center line of the allowable error, the captain of ± per meter 0.1mm. But the length of the conveyor frame centered on the error does not exceed

Over 35mm. When all the single install and pinpoint can then be connected to each block.

     Install idler

     The rack, gear and tensioning device after installation, you can install the upper and lower idler roller frame, so that the belt has slowly changed to curved arc, bending segment prop roll cage roller frame spacing is the normal spacing of 1 / 2 to 1/3. Idler installation, you should make it flexible rotary light.

     Install drive unit
    
     Install drive unit must pay attention to the belt conveyor belt conveyor drive shaft and perpendicular to the centerline, the width of the drive roller conveyor centerline central and coincides with the axis of the drive shaft reducer lines parallel. Also, all shafts and rollers should be leveling. Axis

Horizontal error, according to the width of the conveyor, allowing the range of 0.5-1.5mm. Driving means installed at the same time, the tail wheel, etc. can be mounted tensioning device, the tensioning device of the axis of the drum, should be perpendicular to the centerline of the belt conveyor.

     Belt conveyor belt in order to ensure the final standard idlers and rollers are always in the center line of the operation, installation rollers, racks and rollers must meet the following requirements:

     Conveyor belt hanged hanged, the first shop in the strip conveyor idlers load segment, the Wai hold after the drive roller, and then deposited in the heavy segment on roller. Let hanging strips of use 0.5-1.5t hand winch. Connecting strip in tension, should tensioning device

Move roller limit position of the car and spiral tensioning device To pull gear shift direction; while picking up vertical clamping devices to make the drum moves to the top. In previous belt tension should be installed reducer and motor, tilt conveyor confidential installed brakes. Belt conveyor

After installation, the need for idling test machine.

     Frame supporting structure must be linear, but keeping the horizontal level. To this end, the drive roller and roller frame after installation, should the centerline and the horizontal Food conveyor for final alignment. Then fixed on the basis of the rack or floor. After fixing belt conveyor can be installed to

Loading and unloading devices.
    
     All rollers must line up parallel to each other and keep the horizontal level. All cylinders arranged in rows parallel to each other.