Loading machinery use and maintenance of run-in period



Loading machinery use and maintenance of run-in period
First, the run-in period features
1 wear faster
Since the new machine parts processing, assembly and adjustment factors, the friction surface roughness, with the surface contact area is small, uneven surface pressure

conditions. The machine during operation, some parts of the surface irregularities friction fitted to each other, grinding down to the metal debris and continue to participate

as an abrasive friction, more accelerated wear of the mating surfaces of the parts. Therefore, run-in period is likely to cause parts (especially the mating surface) of the

wear, wear faster. At this time, if the overload operation, it may cause damage to components, resulting in premature failure.  bucket elevators
2. Poor lubrication
Parts of the new assembly with the gap is small, and of the assembly and other reasons, it is difficult to ensure uniformity with the gap, lubricant (grease) on the friction

surface is not easy to form a uniform film to prevent wear. Thereby reducing the lubrication performance, resulting in abnormal wear of the early parts. Cause serious friction

with precision surface scratches or bite phenomenon, leading to failure.
3. Loosening
New processing and assembly of parts, the presence of geometry and with the size of the deviation, the initial period in the loader, due to shock, vibration and alternating   Turn conveyor

load, and heat, deformation and other factors, coupled with excessive wear and other reasons, easily so that the original tightening of loose parts.
4. Leakage occurs
Loosening of the mechanical vibration of combined heat the machine, the machine and the sealing surface fitting logout leakage phenomenon, part casting, machining and other

defects in the assembly debugging difficult to find, but during the operation of the vibration, shock role of this flaw is exposed, the performance of the drain (infiltration)

(water), therefore, prone to leakage run-in period.
5. Operational errors and more
Because of the structure of the machine, do not know enough performance (especially the new operator), susceptible to failures caused by operational errors, and even cause

mechanical accidents.
Second, run the application and maintenance of
1. Since construction machinery is a special vehicle, operating personnel should receive factory training, guidance, and the machine structure, properties have a full

understanding of, and access to certain operating and maintenance experience before operating the machine. Manufacturers to provide "product maintenance manual" is the operator

to operate the equipment necessary information before operating the machine, be sure to read the "maintenance manual", according to the requirements of operation and

maintenance.
2. Note that the workload run-in period, half of the workload run-in period should not exceed the rated working load of 60%, and to arrange for appropriate workload, long

continuous operation to prevent the machine overheating caused by the occurrence of the scene.
3. Note that each instrument instruction frequently observed, abnormal should be excluded promptly stop in reason is not found, the fault is not excluded should be stopped

before operation.
4. Note that regular checks of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) bit and the quality and attention to check the tightness of the machine.

Inspection found that too much water is missing, you should analyze the reasons. Meanwhile, the lubrication points should be strengthened lubrication is recommended run-in

period, the class must be on the lubrication point greasing (except for special requirements).
5. Keep the machine clean, adjust, tighten loose parts to prevent loosening due to increased wear and tear parts or cause parts missing.
6. Run-in period is over, deal with the mandatory machine maintenance, inspection and adjustment of work to do, while paying attention to fluid replacement.