Screw the rules Introduction

Screw conveyor is commonly used in transportation equipment, rational use of screw conveyor can greatly reduce our production costs , including its use before the job , the job

, the job , the following January 1.
Screw conveyor safety procedures are:
First, the operator must ensure that sufficient classes before the break , to ensure energetic ; posts before to Wear flexible conveyor protective equipment.
Second, all the staff are not allowed to cross the conveyor screw conveyor during operation , are not allowed to open the cover , are not allowed into his body , or other debris

inside the screw conveyor .
Third, the torque converter Telescopic belt conveyor should be required to use the specified oil to maintain proper oil level , and add a protective cover.
Fourth, non- duty personnel on duty are not allowed to operate conveyors, non-native workers allowed to enter the conveyor corridor .
Fifth, strong overload conveyor screw conveyor is strictly prohibited .
Six , before operation
1 Press the technical operating requirements check the mechanical parts and no-load running test to confirm compliance with the requirements. Check the communication device

system, confirm contact signal clear and accurate.
(2) The inspection trials met the conditions of use , to confirm the control for safety and good safety records to confirm the time and confirm the name, archived for future

reference .
Seven , job
1 strictly in accordance with the control signal instructions for mechanical operation.
(2) Check the operation prohibited wear gloves mechanical parts .
3 on-site manual operation, the material to be self- terminus tail sequence starting after the front and rear ; spiral head from front to back loading terminus sequence

downtime.
4 in strict accordance with the material requirements of steering control output conveyor throughput , prevent material overflow warehouse, tank overflow tank or cause strong

squeeze .
5 are not allowed to open a variety of protective cover and tank cover shall not carry the machine repair, maintenance and dismantling .
6 To stop the job before unloading conveyor material inside , so that the machinery is in idle state ready for shutdown processing .
Eight , job
1 mechanical thorough cleaning , maintenance , lubrication and rust , machinery require water spray , shall close the electrical part cover to prevent water washout damp.
(2) on the transport corridor and the control of electrical machines for dust removal , dehumidification process , the liquidation shall be required to restore them closed